Instant driveway quote • No obligation
Driveway Cost Calculator
Use our free driveway cost calculator to see a real installed price for your block paving driveway in under 30 seconds.
- • See a real price, not a vague range
- • Includes excavation, sub-base, membrane, and screeding
- • Send your result to WhatsApp or book a survey in 1 tap
Length × Width. Typical double driveway is 50m²
Optional Extras(Edging, Drainage, Features)
Your Instant Quote
Updates as you adjust options
For 50m² standard block paving
Estimated Materials
Includes 10% wastage. Actual quantities depend on ground conditions.
What's included: Full excavation (200mm), MOT Type 1 sub-base (100mm), membrane, professional screeding, kiln-dried sand, edge restraints, waste removal.
Final price confirmed after free site survey. Standard ground conditions assumed.
What's Included in Every Quote
Transparent Driveway Pricing — No Hidden Costs
Most paving companies make you book a quote visit, waste your time, then hit you with a number plucked from thin air. We believe you deserve transparent pricing from the start.
✓ Fair & Transparent Rates
We publish our rates because we're confident they're fair. No haggling, no "cash price" games.
✓ Complete Installation
Every quote includes proper excavation, quality sub-base, membrane, and professional screeding.
✓ Professional Standards
Same professional standard whether you choose budget or premium materials.
✓ No Surprises
What you see in the calculator is what you'll pay. No hidden extras or surprise costs.
Why Proper Installation Matters (And What Others Skip)
What We Never Skip (And Why)
| Essential Step | Why It Matters | "Saving" | Cost to Fix |
|---|---|---|---|
| 200mm Excavation | Prevents sinking and movement | Save ~£300 | £3000+ relay |
| Membrane Layer | Stops weeds and moisture | Save ~£200 | £800+ to fix |
| 100mm Sub-base | Distributes weight properly | Save ~£400 | Often full replacement |
| Proper Screeding | Ensures perfect drainage | Save ~£200 | Pooling/uneven surface |
| Edge Restraints | Prevents spreading | Save ~£300 | Blocks move within a year |
The Step You Won't See (But Will Feel): Proper Screeding
- We set screeding rails to exact levels, checked with a laser
- We screed to a 1:80 fall for drainage — no "eye-balling"
- Takes 2–3 hours extra, prevents pooling and rocking blocks
Skipping screeding can save ~£200 on the quote and cost you years of frustration.
Material Quality
Budget blocks fade and shift. Premium blocks maintain appearance. Natural stone lasts generations. You get what you pay for.
Preparation Matters
Proper depth prevents sinking. Quality sub-base prevents movement. Membrane stops weed growth. Rushing prep causes failures.
Access Affects Time
Direct access: 2–3 days typical. Difficult access adds 1–2 days. Manual handling can be 3× longer — reflected in cost.
Questions to Ask Any Paving Contractor
- • Will you excavate to 200mm?
- • Is membrane included?
- • How do you ensure levels are perfect (screeding)?
- • Does your guarantee cover sinking?
- • Can I see your insurance certificate?
- • Will you provide a written quote?
Got a Quote That Seems Too Cheap?
WhatsApp us the quote and we’ll tell you (honestly) what’s likely missing.
WhatsApp us your quoteRead the Fine Print on Guarantees
Typical "Guarantees" Exclude
- ❌ Sinkage ("ground settlement")
- ❌ Edge movement ("natural spreading")
- ❌ Weed growth ("act of nature")
- ❌ Water pooling ("weathering")
Our 5‑Year Guarantee Covers
- ✅ ALL sinkage issues
- ✅ Edge stability
- ✅ Weed breakthrough
- ✅ Pooling and drainage
- ✅ Workmanship defects
Get Your Exact Driveway Quote — Free Site Survey
Share a few details and we’ll turn your calculator estimate into a fixed quote. No pushy sales, just straight answers.
Driveway Cost Calculator FAQ
How accurate is the calculator?
Within 5–10% for standard installations. Complex drainage, slopes, or poor ground conditions may affect the final price.
Why are you more expensive than some quotes?
We include every essential step. A cheap quote that skips membrane, excavation depth, and screeding isn’t cheaper — it’s incomplete.
What’s not included?
Removing deep foundations or tree roots, soakaways if required, planning permission, or fixing existing drainage issues.
How long does installation take?
Typically 4–5 days for a standard double drive. Others quote 2 days because they skip crucial steps — we don’t.
Can I send photos on WhatsApp?
Absolutely — it helps us give you quick initial advice. We’ll reply as soon as we can.