Driveway Cost Calculator
See a real installed price for your block paving driveway in under 30 seconds. The same numbers we use to quote — no vague ranges, no sales call needed first.
- A real price, not a vague range
- Includes excavation, sub-base, membrane and screeding
- Send to WhatsApp or book a survey in one tap
Your live estimate
Length × width. Typical double driveway ≈ 50m².
Easy (van within 10m)
Optional extrasEdging · Drainage · Features
Your instant quote
Updates as you adjust options
For 50m² standard block paving
Estimated materials
Includes 10% wastage. Actual quantities depend on ground conditions.
What's included: Full excavation (200mm), MOT Type 1 sub-base (100mm), membrane, professional screeding, kiln-dried sand, edge restraints, waste removal.
Final price confirmed after free site survey. Standard ground conditions assumed.
Cost breakdown
Includes: Excavation (200mm), MOT Type 1 sub-base, membrane, screeding, kiln-dried sand, edge restraints, waste removal. Confirmed after a free site visit.
Estimate
£7,200
In every quote
What's included as standard
Pricing approach
Transparent driveway pricing — no hidden costs
Most paving companies make you book a quote visit, waste your time, then hit you with a number plucked from thin air. We believe you deserve transparent pricing from the start.
Fair & Transparent Rates
We publish our rates because we're confident they're fair. No haggling, no "cash price" games.
Complete Installation
Every quote includes proper excavation, quality sub-base, membrane, and professional screeding.
Professional Standards
Same professional standard whether you choose budget or premium materials.
No Surprises
What you see in the calculator is what you'll pay. No hidden extras or surprise costs.
What sets us apart
Why proper installation matters (and what others skip)
What We Never Skip (And Why)
| Essential Step | Why It Matters | "Saving" | Cost to Fix |
|---|---|---|---|
| 200mm Excavation | Prevents sinking and movement | Save ~£300 | £3000+ relay |
| Membrane Layer | Stops weeds and moisture | Save ~£200 | £800+ to fix |
| 100mm Sub-base | Distributes weight properly | Save ~£400 | Often full replacement |
| Proper Screeding | Ensures perfect drainage | Save ~£200 | Pooling/uneven surface |
| Edge Restraints | Prevents spreading | Save ~£300 | Blocks move within a year |
The Step You Won't See (But Will Feel): Proper Screeding
- We set screeding rails to exact levels, checked with a laser
- We screed to a 1:80 fall for drainage — no "eye-balling"
- Takes 2–3 hours extra, prevents pooling and rocking blocks
Skipping screeding can save ~£200 on the quote and cost you years of frustration.
Material Quality
Budget blocks fade and shift. Premium blocks maintain appearance. Natural stone lasts generations. You get what you pay for.
Preparation Matters
Proper depth prevents sinking. Quality sub-base prevents movement. Membrane stops weed growth. Rushing prep causes failures.
Access Affects Time
Direct access: 2–3 days typical. Difficult access adds 1–2 days. Manual handling can be 3× longer — reflected in cost.
Quote checklist
Questions to ask any paving contractor
- • Will you excavate to 200mm?
- • Is membrane included?
- • How do you ensure levels are perfect (screeding)?
- • Does your guarantee cover sinking?
- • Can I see your insurance certificate?
- • Will you provide a written quote?
Got a Quote That Seems Too Cheap?
WhatsApp us the quote and we’ll tell you (honestly) what’s likely missing.
WhatsApp us your quoteRead the fine print
Not all guarantees are equal
Typical "Guarantees" Exclude
- Sinkage ("ground settlement")
- Edge movement ("natural spreading")
- Weed growth ("act of nature")
- Water pooling ("weathering")
Our 5‑Year Guarantee Covers
- ALL sinkage issues
- Edge stability
- Weed breakthrough
- Pooling and drainage
- Workmanship defects
Free site survey
Turn your estimate into a fixed quote
Share a few details and we’ll convert your calculator estimate into a written, fixed-price quote. No pushy sales — just straight answers.
Calculator FAQ
Frequently asked
How accurate is the calculator?
Within 5–10% for standard installations. Complex drainage, slopes, or poor ground conditions may affect the final price.
Why are you more expensive than some quotes?
We include every essential step. A cheap quote that skips membrane, excavation depth, and screeding isn’t cheaper — it’s incomplete.
What’s not included?
Removing deep foundations or tree roots, soakaways if required, planning permission, or fixing existing drainage issues.
How long does installation take?
Typically 4–5 days for a standard double drive. Others quote 2 days because they skip crucial steps — we don’t.
Can I send photos on WhatsApp?
Absolutely — it helps us give you quick initial advice. We’ll reply as soon as we can.